API 610 BB2 and BB5 are between-bearing pump configurations for high-pressure refinery and chemical service. This guide compares BB2 (radial split, single/double stage) and BB5 (radial split, multistage) to help engineers select the right configuration.

API 610 BB Configuration Overview

Between-Bearing Design

  • Shaft supported by bearings at both ends (overhung impeller eliminated)
  • Advantages: handles high power, long shaft, stable, low deflection
  • Use: high flow, high pressure, critical refinery/chemical service
  • Types: BB1 (axially split), BB2 (radially split, single stage), BB3 (axially split, multistage), BB5 (radially split, multistage)
  • Consider: pressure rating, temperature, maintenance access

API 610 BB Types

TypeSplitStagesPressureUse
BB1AxialSingle/doubleMediumGeneral refinery
BB2RadialSingle/doubleHighHigh pressure, high temp
BB3AxialMultiMedium-highBoiler feed, water
BB5RadialMultiVery highHigh pressure, severe

BB2 (Radially Split, Single/Double Stage)

Design Features

  • Radial split: casing halves joined perpendicular to shaft (bolt circle)
  • Single or double suction impeller (double for high flow)
  • Pressure rating: up to 4500 psi (310 bar) or higher
  • Temperature: up to 800°F (425°C) or higher
  • Advantages: high pressure capability, robust, good for severe service

BB2 Applications

  • Refinery: charge pumps, reflux pumps, high-pressure hydrocarbon
  • Chemical: high-pressure reactors, high-temp circulation
  • Power: boiler feed (single stage, high pressure)
  • Gas processing: amine, glycol, high-pressure injection
  • Typical: flow 100-2000 m³/h, head 100-500m (single stage)

BB2 Advantages

  • High pressure: radial split handles high pressure better than axial
  • High temperature: radial split gasket better at high temp
  • Robust: between-bearing, heavy casing
  • Single stage: simpler than multistage, fewer parts
  • Maintenance: casing removal (radial split, heavier than axial)

BB2 Limitations

  • Single stage: limited head (need high speed or large impeller)
  • Heavy casing: radial split is heavy, harder to maintain
  • Cost: more expensive than OH2 for moderate conditions
  • Footprint: larger than overhung pumps
  • Consider: if head >500m, need BB5 (multistage)

BB5 (Radially Split, Multistage)

Design Features

  • Radial split: multiple stages in series (segmental or barrel design)
  • Stages: 2-12+ (each adds head)
  • Pressure rating: up to 10,000 psi (690 bar) or higher
  • Temperature: up to 800°F (425°C) or higher
  • Advantages: very high pressure, multistage, robust, severe service

BB5 Applications

  • Refinery: hydrocracker feed, high-pressure injection (100+ bar)
  • Chemical: high-pressure reactors, urea, methanol synthesis
  • Power: boiler feed (high pressure, >100 bar)
  • Gas processing: high-pressure injection, CO2 sequestration
  • Typical: flow 50-500 m³/h, head 500-3000m (multistage)

BB5 Advantages

  • Very high pressure: multistage, radial split (barrel design)
  • High temperature: radial split gasket, robust casing
  • Efficiency: multiple small stages (each near BEP)
  • Thrust balancing: balance drum or disc (multistage)
  • Severe service: designed for extreme conditions

BB5 Limitations

  • Complex: multiple stages, more parts, higher cost
  • Maintenance: more complex (rotor removal, stage assembly)
  • Cost: significantly more expensive than BB2
  • Footprint: longer (multiple stages)
  • Consider: if single stage sufficient, BB2 is simpler/cheaper

BB2 vs BB5 Comparison

ParameterBB2BB5
Stages1-22-12+
Max pressure~4500 psi~10,000+ psi
Max head~500m~3000m+
Flow range100-2000 m³/h50-500 m³/h
ComplexityModerateHigh
CostModerateHigh
MaintenanceModerateComplex
Typical useHigh pressure single stageVery high pressure multistage

Selection Guide

When to Choose BB2

  • Head requirement: ≤500m (single stage sufficient)
  • Pressure: ≤4500 psi (310 bar)
  • Flow: high (100-2000 m³/h)
  • Temperature: high (up to 425°C)
  • Preference: simpler, lower cost, easier maintenance

When to Choose BB5

  • Head requirement: >500m (need multistage)
  • Pressure: >4500 psi (310 bar)
  • Flow: moderate (50-500 m³/h)
  • Temperature: high (up to 425°C)
  • Severe service: hydrocracker, high-pressure injection, boiler feed

Consider BB3 (Alternative)

  • Axially split multistage: easier maintenance than BB5
  • Pressure: medium-high (≤200 bar typically)
  • Temperature: moderate (≤300°C, axial split gasket limit)
  • Use: boiler feed, water, moderate pressure hydrocarbon
  • Consider: if pressure/temp moderate, BB3 easier to maintain

API 610-Specific Considerations

Hydrocracker Service

  • Very high pressure: 100-200 bar (BB5 required)
  • High temperature: 300-400°C
  • Material: duplex, Hastelloy, Inconel (H2S, H2 environment)
  • Seal: API 682 double seal, Plan 53B (barrier fluid)
  • Consider: hydrogen embrittlement, high pressure sealing

Boiler Feed Service

  • High pressure: 50-200 bar (BB3 or BB5)
  • High temperature: 100-200°C (feedwater)
  • Material: 12% Cr, duplex (high energy, cavitation resistance)
  • NPSH: critical (hot water, high vapor pressure)
  • Consider: first stage low-NPSH impeller, booster pump

High-Temp Circulation

  • Moderate pressure, high temperature: BB2 (single stage)
  • Temperature: 300-425°C (thermal oil, hot hydrocarbon)
  • Material: 12% Cr, alloy steel (high temp strength)
  • Thermal growth: centerline mounted, piping expansion
  • Consider: thermal expansion, lubrication, seal flush cooling

Maintenance Comparison

BB2 Maintenance

  • Casing removal: radial split (remove top half, heavy)
  • Rotor: removable (between bearings, need coupling removal)
  • Seal: accessible (cartridge seal, spacer coupling)
  • Time: moderate (4-8 hours for overhaul)
  • Consider: lifting equipment (heavy casing)

BB5 Maintenance

  • Rotor removal: pull from end (segmental design) or remove barrel cover
  • Stages: multiple impellers, diffusers, stage assemblies
  • Balance: thrust balancing device (drum/disc) inspection
  • Time: complex (8-24 hours for overhaul)
  • Consider: specialized tools, trained technicians, spare rotor

Common Issues

  • Wrong selection: BB2 for too high head (inefficient, unstable). Use BB5 for >500m.
  • BB5 overkill: High cost, complexity for moderate conditions. Use BB2 if single stage sufficient.
  • Thermal growth ignored: Nozzle loads, misalignment. Centerline mount, expansion loops, cold alignment offset.
  • High pressure sealing: Seal failure, leakage. API 682 double seal, Plan 53B, proper flush.
  • NPSH insufficient: Cavitation, damage. Low-NPSH first stage, booster, improve suction.
  • Balance device wear: Thrust bearing failure. Inspect balance drum/disc, monitor thrust bearing temp.
  • No spare rotor: Long downtime. Keep spare rotor (especially BB5).
  • Improper alignment: Bearing/seal failure. Laser align, correct for thermal growth.

Procurement Recommendations

  1. Determine required head: ≤500m → BB2, >500m → BB5
  2. Consider BB3 (API 610 BB3) for moderate pressure, easy maintenance
  3. Specify material per fluid (12% Cr, duplex, Hastelloy, Inconel)
  4. For hydrocracker: specify BB5, duplex/Hastelloy, API 682 double seal
  5. For boiler feed: specify multistage, low-NPSH first stage, 12% Cr
  6. Require API 610 compliance (L10 bearing life, vibration, testing)
  7. Specify centerline mounting for high temp (thermal growth)
  8. Include spare rotor (especially for BB5, critical service)
  9. Require performance test, NPSH test, mechanical run test
  10. Verify supplier has BB2/BB5 design and application experience

Related Industries

API 610 BB2 vs BB5 selection applies to oil & gas (refinery hydrocracker, pipeline, upstream), petrochemical (ethylene, ammonia, methanol), chemical processing (high-pressure reactors), power generation (boiler feedwater), and gas processing (high-pressure injection). The core principle — selecting between single-stage BB2 and multistage BB5 based on head, pressure, and severity requirements — is consistent across all high-pressure critical pump applications.