API 682 defines standard piping plans for mechanical seals in centrifugal and rotary pumps. The correct flush plan controls seal chamber pressure, temperature, and fluid condition โ€” directly affecting seal life. A poorly selected flush plan can reduce seal life from 5+ years to months. This guide covers API 682 flush plans (Plan 01 through Plan 76), selection criteria, and common mistakes.

API 682 Seal Types

TypeDescriptionTypical applications
Type ASingle seal, O-ring pusherGeneral purpose, clean fluids, <200ยฐC
Type BSingle seal, metal bellows (non-pusher)High temp (>200ยฐC), polymerizing fluids, coking
Type CSingle seal, O-ring pusher, high pressureHigh pressure (>40 bar), abrasive fluids
Type DDouble seal (dual, pressurized)Hazardous, toxic, carcinogenic fluids (zero leakage)
Type ETandem seal (dual, unpressurized)Hazardous fluids with backup containment

Common API 682 Flush Plans

PlanDescriptionBest forKey components
Plan 01Internal recirculation from pump discharge to seal chamberClean, non-coking fluids, <150ยฐCInternal recirculation orifice
Plan 02No flush โ€” dead-ended seal chamberClean fluids, low temp, vertical pumpsNone (convection cooling only)
Plan 11Single flush from discharge to seal chamber via orificeMost common for clean fluids, general serviceOrifice, flush line
Plan 13Recirculation from seal chamber back to suctionVertical pumps, low NPSH, light hydrocarbonsOrifice, recirculation line
Plan 14Combination Plan 11 + Plan 13 (discharge to seal, seal to suction)High vapor pressure fluids, vertical pumpsTwo orifices, two lines
Plan 21Flush from discharge through cooler to seal chamberHot fluids (>150ยฐC), clean serviceCooler, orifice, flush line
Plan 23Closed-loop recirculation: seal chamber โ†’ cooler โ†’ seal chamberHot, dirty, or polymerizing fluids (isolates seal from process)Cooler, circulating device (pumping ring)
Plan 31Flush from discharge through cyclone separator (solids removed) to sealSlurries, abrasive fluids, <2% solidsCyclone separator, orifice
Plan 32External flush from clean source to seal chamberSlurries, dirty fluids, when clean external fluid availableExternal clean fluid, regulator, orifice
Plan 41Plan 21 + cyclone separator (discharge โ†’ cyclone โ†’ cooler โ†’ seal)Hot, abrasive fluidsCyclone, cooler, orifice
Plan 52Unpressurized dual seal with external reservoir (barrier fluid)Hazardous fluids, backup containment, emissions controlReservoir, cooler, level switch
Plan 53APressurized dual seal with external reservoir (piston/pneumatic pressurization)Toxic/carcinogenic fluids, zero leakage requiredPressurized reservoir, cooler, pressure switch
Plan 53BPressurized dual seal with bladder accumulator (barrier fluid)Toxic fluids, high pressure, zero leakageBladder accumulator, cooler, pressure switch
Plan 53CPressurized dual seal with piston accumulator (process pressure pressurizes barrier)Toxic fluids, variable process pressurePiston accumulator, cooler
Plan 54Pressurized dual seal with external barrier fluid circulation systemMultiple pumps, central barrier fluid systemExternal tank, pump, cooler, controls
Plan 55Unpressurized dual seal with external reservoir (no circulation โ€” gravity)Light duty, backup containmentReservoir, level switch
Plan 62External quench to atmospheric side of single seal (steam/water)Hot fluids, coking, polymerizing, crystallizingQuench connection, drain
Plan 65A/BLeakage detection (orifice + pressure switch or flow switch)Emissions monitoring, single sealsOrifice, pressure/flow switch
Plan 71No external connections โ€” containment seal onlyDry containment, non-hazardous backupNone
Plan 72External buffer gas to containment seal (unpressurized dual gas seal)Gas seals, dry gas containmentGas supply, regulator, flow switch
Plan 74Pressurized barrier gas to dual gas sealDry gas seals, toxic gas serviceGas supply, regulator, pressure switch
Plan 75Leakage drainage from containment seal to reservoirCondensing leakage, liquid collectionReservoir, level switch
Plan 76Leakage drainage to atmosphere (non-condensing gas)Gas leakage monitoringFlow switch, vent

Critical: Flush Plan Selection by Fluid Type

Fluid typeRecommended planWhy
Clean, non-coking, <150ยฐCPlan 11Simple, reliable, adequate cooling
Clean, hot (>150ยฐC)Plan 21 or Plan 23Cooler reduces seal temp; Plan 23 isolates seal from dirty process
Abrasive/slurry (<2% solids)Plan 31 or Plan 32Cyclone removes solids (31) or external clean flush (32)
Hot + abrasivePlan 41Cyclone + cooler combined
Polymerizing/coking (e.g., bitumen, sulfur)Plan 23 + Plan 62Closed-loop cooling + steam quench prevents coking at atmospheric side
High vapor pressure (LPG, propane)Plan 13 or Plan 14Recirculation to suction prevents flashing in seal chamber
Toxic/carcinogenic (VCM, Brโ‚‚, phosgene)Plan 53A/B/C (dual pressurized)Zero leakage โ€” barrier fluid pressure > process pressure
Hazardous but less criticalPlan 52 (dual unpressurized)Backup containment, emissions monitoring
Vertical pumpsPlan 13 or Plan 14Seal chamber above impeller; recirculation to suction
Dry gas (compressors)Plan 72/74Gas barrier/buffer for dry gas seals

Critical: Plan 23 โ€” The Most Misapplied Plan

Plan 23 (closed-loop recirculation with cooler) is often specified but frequently misapplied:

  • How it works: A pumping ring (in seal chamber) circulates seal chamber fluid through an external cooler and back. The seal chamber is ISOLATED from the pump process fluid (only a small initial fill).
  • Best for: Hot, dirty, or polymerizing fluids where you don't want process fluid reaching the seal. Common in refineries for hot hydrocarbon, bitumen, and sulfur service on API 610 pumps.
  • Common mistake: Using Plan 23 for clean, cool fluids where Plan 11 is simpler and cheaper. Plan 23 adds a cooler, circulating device, and piping โ€” unnecessary complexity for clean service.
  • Another mistake: Inadequate cooler sizing. The cooler must remove heat from both seal face friction AND process heat conduction. Undersized cooler โ†’ seal overheats โ†’ premature failure.

Critical: Plan 53A/B/C โ€” Zero Leakage Seals

For toxic, carcinogenic, or environmentally hazardous fluids, dual pressurized seals (Plan 53 series) provide zero leakage:

  • Principle: Barrier fluid (clean oil or water) is pressurized ABOVE process pressure (typically 1.5โ€“2 bar above). If the inboard seal fails, barrier fluid leaks INTO the process (not process to atmosphere). The outboard seal contains the barrier fluid.
  • Plan 53A: Piston or pneumatic pressurization of reservoir. Simple, but barrier fluid pressure varies with process pressure.
  • Plan 53B: Bladder accumulator maintains constant barrier pressure. Better for variable process pressure. Most common for refinery hazardous service.
  • Plan 53C: Piston accumulator uses process pressure itself to pressurize barrier (1:1 ratio). Always maintains barrier > process. Best for high-pressure or variable-pressure service.
  • Barrier fluid selection: Must be compatible with process fluid (if inboard seal fails, barrier mixes with process). Common: clean lubricating oil, water/glycol, or process-compatible fluid. Must be clean (filtered to <10 ฮผm).

Critical: Plan 62 Quench โ€” Preventing Coking and Crystallization

Plan 62 (external quench) is essential for fluids that solidify, coke, or crystallize at the atmospheric side of the seal:

  • Steam quench: For hot fluids (bitumen, sulfur, molten salts) that coke/cool-solidify. Steam keeps atmospheric side warm and flushes away deposits.
  • Water quench: For crystallizing fluids (urea, caustic, salts). Water dissolves crystals and cools the seal.
  • Common mistake: No quench on coking service โ†’ seal face cokes โ†’ seal hangs up โ†’ catastrophic failure. Always specify Plan 62 for fluids with melting point >40ยฐC or coking tendency.

Common Problems and Solutions

Problem 1: Seal fails in 3โ€“6 months on clean water service. Plan 11 with undersized orifice โ€” insufficient flush flow, seal overheats. Solution: verify orifice size per API 682 (typically 3โ€“6 mm). Check flush flow rate (should be 5โ€“15 L/min). Ensure flush line is not blocked. Consider Plan 23 if fluid has any contamination.

Problem 2: Seal leaks on hot bitumen pump (coking). No Plan 62 quench โ€” bitumen cools and solidifies at atmospheric side, damaging seal face. Solution: add Plan 62 steam quench (1โ€“2 bar steam, continuous). Use Type B metal bellows seal (no O-rings to coke). Plan 23 closed-loop cooling. Our API 610 BB2 pumps for hot service include Plan 23 + 62 as standard.

Problem 3: Dual seal barrier fluid pressure drops (Plan 53B). Bladder accumulator loses pressure or inboard seal fails. Solution: install pressure switch with low-pressure alarm. Check barrier fluid level (reservoir sight glass). If inboard seal fails, barrier fluid level rises in reservoir (process fluid enters barrier). Schedule seal replacement during planned outage.

Problem 4: Plan 31 cyclone plugs on slurry service. High solids (>2%) overwhelm cyclone separator โ€” solids reach seal. Solution: use Plan 32 (external clean flush) instead for >2% solids. Ensure cyclone underflow drain is open (not blocked). Size cyclone for actual solids loading. Consider slurry pump with mechanical seal designed for solids.

Problem 5: Seal overheats on Plan 23 application. Cooler undersized or pumping ring not generating enough flow. Solution: verify cooler heat duty (must remove seal face heat + process conduction). Check pumping ring direction (must match pump rotation). Ensure cooler is not fouled. Increase cooler size by 50% margin.

Selection Summary

  1. Clean <150ยฐC: Plan 11 (most common, simple)
  2. Clean >150ยฐC: Plan 21 (cooler) or Plan 23 (closed-loop, isolate seal)
  3. Abrasive <2%: Plan 31 (cyclone) or Plan 32 (external clean flush)
  4. Hot + abrasive: Plan 41 (cyclone + cooler)
  5. Coking/polymerizing: Plan 23 + Plan 62 (closed-loop + quench)
  6. High vapor pressure: Plan 13 or 14 (recirculate to suction)
  7. Toxic/carcinogenic: Plan 53A/B/C (dual pressurized, zero leakage)
  8. Hazardous backup: Plan 52 (dual unpressurized, containment)
  9. Vertical pumps: Plan 13 or 14
  10. Gas seals: Plan 72/74
  11. Critical: match plan to fluid properties (temp, solids, coking, toxicity), don't over-specify Plan 23 for clean service, Plan 53 barrier fluid must be process-compatible, Plan 62 essential for coking/crystallizing fluids, verify orifice sizes and cooler sizing
  12. Our API 610 pumps support all standard flush plans; magnetic drive pumps eliminate seals entirely for hazardous fluids. For seal flush plan selection, talk to our engineers with your fluid properties, pump type, and operating conditions.